Job Scope: All Survey Jobs, Propellor Shaft Withdrawal, Hull Blasting and Painting, Steel and Pipeline Renewal.
Job Scope: Steel Renewal (50 Tons), Ballast Water Treatment System (BWTS) - Pre and Post Fabrication, Installation and Testing.
Job Scope: Steel and Pipeline Renewal.
Job Scope: Ballast Water Treatment System (BWTS) - Pre and Post Fabrication, Installation and Testing, Various Miscellaneous Jobs.
Job Scope: Conversion from Oil Tanker to Bitumen Tanker. 10 Tons of Steel and 5000 Metres of Pipeline Jobs.
Copyright © 2023 Gama Ship Repair L.L.C All Rights Reserved.