Job Scope: All Survey Jobs, Propellor Shaft Withdrawal, Hull Blasting and Painting, Steel and Pipeline Renewal.
Job Scope: Steel Renewal (50 Tons), Ballast Water Treatment System (BWTS) - Pre and Post Fabrication, Installation and Testing.
Job Scope: Steel and Pipeline Renewal.
Job Scope: Ballast Water Treatment System (BWTS) - Pre and Post Fabrication, Installation and Testing, Various Miscellaneous Jobs.
Job Scope: Conversion from Oil Tanker to Bitumen Tanker. 10 Tons of Steel and 5000 Metres of Pipeline Jobs.
Job Scope: Conversion from Oil Tanker to Bitumen Tanker.
Job Scope: All Survey Jobs, Ballast Water Treatment System (BWTS) - Pre and Post Fabrication, Installation and Testing, Lifeboat and Davit Installation and Commissioning, Main Engine (Daihatsu) Overhauling and Service, Auxiliary Engine (Cummins) Overhauling and Service, Hull Blasting and Painting.
Job Scope: Insulating the insides of the bitumen tanks below to the deck so as to maintain sufficient temperature.